Event rules
Check Detroit’s service level
Use the official plan to understand which roads are included at the current snowfall depth.
Open Detroit snow managementDetroit, MI winter guide
Detroit changes its response with snowfall depth. Major roads are treated in smaller events, while city contractors are dispatched to residential streets when accumulation reaches about six inches.
Start with the official answer
These links go directly to the city tools residents need during a storm.
Event rules
Use the official plan to understand which roads are included at the current snowfall depth.
Open Detroit snow managementParking
Red-and-white snow-emergency routes can be posted in advance and vehicles may be ticketed or towed.
Read emergency-route rulesResident request
Report an eligible city-maintained street after the correct service level and route phase.
Open Detroit service guidanceHow the response unfolds
Detroit follows a local sequence. Knowing the phase explains why one road can be clear while another is still waiting.
For events up to three inches, the city focuses on salting the major-road network and keeping it passable.
At three to six inches, the city plows higher-priority thoroughfares first and expands through the major network.
At six inches or more, district contractors plow residential streets while city crews maintain the major routes.
Before leaving the car
Resident checklist
Check the official snowfall service level before expecting residential plowing.
Move vehicles off signed emergency routes and, during large events, off residential streets when requested.
Clear the adjoining sidewalk and keep shoveled snow out of the travel lane.
Identify whether the road belongs to Detroit, Wayne County, or the state before filing a request.
Service boundaries
The city plow department is not responsible for every road, sidewalk, driveway, alley, or parking area.
Maintains 673 miles of major roads and manages the city snow and ice response.
District contractors are dispatched for the city’s 1,884 miles of residential streets during Level 3 events.
State trunklines, county roads, freeways, sidewalks, driveways, and private property have separate responsibility.
If the street looks missed
Do not treat a residential street as missed during a Level 1 or Level 2 event, because the city’s residential contractor response begins at Level 3.
Local questions answered
Short answers for the questions residents usually have during an active storm.
The city dispatches district contractors for residential streets during Level 3 events, generally when snow reaches six inches or more.
Wayne County and state agencies handle designated county roads, freeways, and state trunklines; Detroit DPW handles city major roads.
In a Level 2 event, the highest-priority routes are targeted first, while the full major-road and bike-lane network can require 48 to 72 hours depending on conditions.
Verify the answer
Storm conditions and emergency rules change. These are the public-agency pages used for this guide.
More official guides